Warehouse Construction
Pre-engineered steel warehouse with GI roofing, MS purlins, and column-and-beam frame. Delivered on schedule for a logistics client.
Factory Shed Installation
Single-span manufacturing shed with turbo ventilators, translucent sheets, and rain gutters for a chemical processing unit.
Commercial Workshop
Heavy-duty sliding and swing gate installation for a multi-tenant commercial workshop with wide entry spans.
Structural Steel Assembly
Columns, beams, and pipe rack structure fabricated and erected for an industrial plant with full NDT inspection documentation.
Mezzanine Floor Fabrication
Two-level MS mezzanine with chequered plate flooring, safety railings, and staircase installed inside a manufacturing unit.
Heavy-Duty Industrial Gates
Cantilever gate with motor-automation for a large logistics yard requiring frequent heavy-vehicle movement and 24/7 security operation.
